WBS Flashing Warning Light
60 V DC, XENON, Red,
Product number:
21003655000
Flashing light with 5J performance in a sturdy metal housing with red lens
- Can be used universally
- Housing and fixing bracket made of sturdy, anodised aluminium
- Aggressive environmental conditions or driving rain cannot damage the light
- Impact-proof lens made of polycarbonate
- Perfectly suitable for harsh industrial environments
- Flash tube additionally secured by a steel clamp
- Service life: after 8 million flashes, still 70% light emission
- Dimensions: 50mm diameter x 200mm
- Operating temperature: -40C - +55C
- Maximum visibility: 181m
- 7 Lens colours: clear, white, yellow, orange, red, green, blue
TECHNICAL DATA
Technical Data
- Signaling area (L | W | H) m
- 9,6 m | 9,6 m | 9,8 m
- Signaling area width m
- 9,6 m
- Signaling area height m
- 9,8 m
- Signaling area length m
- 9,6 m
- Lense Colour
- Red
- Housing Colour
- RAL 1012
- Voltage Range (DC) V
- 50-72 V DC
- Rated Voltage(s) (DC) V
- 60 V DC
- Type of Current
- DC
- Operating Temp. °C
- -40 °C ... +55 °C
- IP Protection System
- 54
- Housing material
- Aluminium (Al Mg Si 1), Yellow Anodised
- El. Protection Class
- 1
- Max. Relative Humidity
- 90 %
- Duty Cycle
- 100 %
- Max. Current Consumption A
- 0,13 A
- Lamp Type
- XENON
- Operating Mode
- Flashing Light
- Light Intensity cd
- 32 cd
- Flash Energy J
- 5 J
- Flash Rate Hz
- 1 Hz
- AS-i
- not specified
- IO-Link
- no
- M12-connection
- no
- Monitored
- no
- Dimensions (H | W | D) mm
- 230 mm | 50 mm | 66 mm
- Weight (without packaging) kg
- 0,3 kg
- ETIM-Class
- EC001333
- Signaling area (L | W | H)
- 31.5 ft. | 31.5 ft. | 32.15 ft.
- Signaling area width
- 31.5 ft.
- Signaling area height
- 32.15 ft.
- Signaling area length
- 31.5 ft.
- Lense Colour
- Red
- Housing Colour
- RAL 1012
- Voltage Range (DC) V
- 50-72 V DC
- Rated Voltage(s) (DC) V
- 60 V DC
- Type of Current
- DC
- Operating Temperature
- -40 °F ... +131 °F
- IP Protection System
- 54
- Housing material
- Aluminium (Al Mg Si 1), Yellow Anodised
- El. Protection Class
- 1
- Max. Relative Humidity
- 90 %
- Duty Cycle
- 100 %
- Max. Current Consumption
- 0.13 A
- Lamp Type
- XENON
- Operating Mode
- Flashing Light
- Light Intensity cd
- 32 cd
- Flash Energy J
- 5 J
- Flash Rate Hz
- 1 Hz
- AS-i
- not specified
- IO-Link
- no
- M12-connection
- no
- Monitored
- no
- Dimensions (H | W | D)
- 9.06 in. | 1.97 in. | 2.6 in.
- Weight (without packaging)
- 0.66 lbs
- ETIM-Class
- EC001333
Technical Data
TECHNICAL DRAWINGS
Technical Drawings
ACCESSORIES
Accessories
DOWNLOADS
Downloads
Description | Language | Type | Size | Link |
---|---|---|---|---|
Manual_Abx_WBx | German | 685.6 KB | Download | |
Product_Sheet_DE_WB_WBL-PX | German | 146.29 KB | Download | |
EAC_Certificate_Signaling | German | 293.12 KB | Download | |
Product_Sheet_EN_WB_WBL-PX | Englisch | 147.11 KB | Download | |
EAC_Certificate_Signaling | Englisch | 293.12 KB | Download | |
Manual_Abx_WBx | Englisch | 685.6 KB | Download |